Work done without a permit. A permit that expired before final inspection. A permit an old contractor opened and walked away from. These are all fixable — and all of them get more expensive the longer they sit.
- Investigation-phase cases welcome
- We handle abandoned contractor permits
- Closing-deadline work prioritized
- All 67 Florida counties
The four situations we see most
- Work performed without any permit. A remodel, an addition, a re-roof, an enclosure, a shed, an electrical or plumbing change. It gets discovered by a neighbor complaint, an insurance inspection, an appraisal or a sale. The fix is an after-the-fact permit.
- A permit that expired before final inspection. Florida building departments generally treat a permit as expired after a defined period without an approved inspection. The work may be finished and perfectly sound — but on the record it is incomplete.
- A permit that was never closed out. The work passed, the crew left, and nobody scheduled the final. It sits open indefinitely and surfaces during a municipal lien search, usually at the worst possible time.
- A permit an old contractor abandoned. The contractor pulled the permit, did part of the work, and disappeared. The permit is in their name, the property is yours, and the building department will not talk to you about it until the file is untangled.
What an after-the-fact permit actually involves
It is not simply a late application. Most Florida jurisdictions run it as an investigation, and the process has steps a normal permit does not.
- An investigation or penalty fee, frequently assessed at a multiple of the standard permit fee. Contractors in Florida forums routinely describe it as roughly triple, though the multiplier is set by local ordinance and varies considerably.
- Documentation of what was actually built. Where there are no as-built drawings, this usually means having plans prepared after the fact.
- Engineer or architect certification. Many jurisdictions require a sealed letter certifying that concealed work meets code, particularly for structural, roofing and electrical work.
- Exposure for inspection. Where work is behind drywall, in a roof assembly, or underground, the jurisdiction may require it be opened up so an inspector can see it. This is the step that most affects cost, and it is sometimes avoidable with the right documentation.
- Current-code compliance. After-the-fact permits are generally reviewed against the code in force today, not the code in force when the work was done.
- Inspections and close-out, on the same path as any other permit.
Realistic timeline: eight to sixteen weeks in most jurisdictions, longer where structural work is involved or where the file has to be reconstructed from nothing. Anyone promising you two weeks on an after-the-fact case has not seen the file.
Expired permits: renewal versus starting over
This is the distinction that matters most financially, and it is the first thing we check. Many Florida jurisdictions offer a renewal or reinstatement path for a permit that has recently lapsed, and require a fresh application for one that has been dormant longer. The difference is not just the fee.
A renewed permit generally continues under the code it was issued under. A fresh application is reviewed under today's code — which after multiple Florida Building Code cycles can mean substantially different requirements for wind load, energy, egress or flood elevation. On a partially built project, that can be the difference between finishing and rebuilding.
We pull the permit history first, establish exactly where the file stands, and tell you which path applies before anyone spends money.
The risk of leaving it alone
- The sale stops. Open and expired permits show up in municipal lien searches. Title companies flag them, buyers' lenders balk, and closings get postponed or collapse.
- Insurance exposure. Carriers have denied claims where damage related to unpermitted or unfinalized work. After a hurricane, this is not hypothetical.
- Escalating code enforcement. Once a case is opened, fines can accrue daily and can become a lien on the property.
- Compounding cost. Each additional code cycle that passes makes bringing old work into current compliance more expensive.
- Contractor liability. Where the work was done under a contractor's license, the licensee carries exposure regardless of who promised to pull the permit.
Questions about this service
How much does an after-the-fact permit cost in Florida?
Two separate numbers: the jurisdiction's fees, which typically include an investigation or penalty multiplier on the standard permit fee and are set by local ordinance, and the professional costs — drawings, engineering certification, any corrective work, and our fee. We give you a scoped estimate of both after pulling the permit history, before you commit.
Will I have to tear open walls?
Sometimes, and it is the single largest cost variable. Where work is concealed, jurisdictions may require exposure so an inspector can verify it. In some cases sealed engineering certification, existing photographs, or a limited inspection opening can satisfy the requirement instead. It is worth having someone argue that case properly before the demolition starts.
Can I sell the house with an open permit?
Legally it is possible in many cases, but practically it usually stops the transaction — title companies flag it, and buyers' lenders often will not proceed. If you are under contract, call us the day it surfaces rather than the week before closing.
I bought a house and discovered unpermitted work from a previous owner. Am I stuck with it?
You are generally the one who has to resolve it, but Florida law provides certain protections for purchasers who acquired the property without knowledge of the violation, and there are statutory routes for closing very old permits. Whether either applies is fact-specific. We assess it before assuming the worst.
The contractor who pulled the permit is gone. What now?
Common, and workable. The path depends on whether the permit can be transferred, released, or closed with a new contractor of record, and jurisdictions handle it differently. We deal with the building department directly to untangle it.
How long does the whole thing take?
Plan on eight to sixteen weeks for a typical after-the-fact case. Simple expired-permit reinstatements where the work is complete and sound can move considerably faster.
Get a free quote for after-the-fact & expired permits
Tell us the address and what is happening. We will tell you which jurisdiction controls it and what it takes.
Related services
Code Compliance & Violations
A code enforcement case does not pause while you decide what to do about it. In many Florida jurisdictions fines run daily from the com…
See the serviceRealtor & Closing Support
The municipal lien search came back with an open permit from 2017. Closing is in eleven days. Everyone is looking at you. This page is …
See the servicePermit Facilitation & Filing
You have a crew scheduled, a client asking for dates, and a permit sitting somewhere in a queue you cannot see. We file it, we track it…
See the serviceCertificate of Occupancy (CO)
The building is finished. The lease starts in two weeks. And the Certificate of Occupancy is waiting on one inspection, one correction …
See the serviceReady to get your permit moving?
One call tells you which jurisdiction controls your project, what it will take, and what it will cost. Most of the time we can scope it on the phone.